SIMHAPURI ENERGY LIMITED
Phase-II (2 X 150 MW)
Phase – II comprising of two Units of 150 MW each is under commercial operation since 26th February,2014 and 31st March,2015 respectively.
Performance :
Performance for the FY 2013-14 is as given below :
UNIT No. | Load Factor in ( % ) | Availability Factor in ( % ) |
1 | 85.57 | 93.29 |
Plant | 85.57 | 93.29 |
Performance as on 31-01-2015 is given below :
UNIT No. | Load Factor in ( % ) | Availability Factor in ( % ) |
1 | 78.68 | 80.73 |
Plant | 78.68 | 80.73 |