Phase-I (2 X 150 MW)


Phase - I comprising of two Units each of 150 MW is under commercial operation since 4th May, 2012 and 15th July, 2012 respectively.


Performance:


Performance for FY 2012-13 is as given below;


Unit No. Load Factor in (%) Availability Factor in (%)
177.1682.39
280.1685.19
Plant78.6683.79

Performance as on 2013-2014 is as given below;


Unit No. Load Factor in (%) Availability Factor in (%)
176.8581.36
283.0887.53
Plant79.9784.44

Performance as on 31-01-2015 is as given below;


Unit No. Load Factor in (%) Availability Factor in (%)
181.3683.52
281.8683.47
Plant81.6183.50

Power Purchase Agreement (PPA) with PTC & AP in Place